In 2016, HUG controlled its supplies, logistics and maintenance costs for goods and equipment, absorbing fluctuations linked to hospital activity along with the increase in services and equipment, while continuing efforts to manage and optimize energy consumption.
50 Gwz consumed
7’850 metric tons of waste treated
449’299 m2 maintened
80 metric tons laundered per week
76’580 beds cleaned
3’520’000 meals prepared, 1’980’000 of which were served to patients
402 missions carried out, almost 14'000 minutes' flight time